PJM Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about PJM? On this page you'll find 72 study documents about PJM.

All 72 results

Sort by

 PJM Generation Dispatcher Exam  2024 with 100% correct answers Popular
  • PJM Generation Dispatcher Exam 2024 with 100% correct answers

  • Exam (elaborations) • 62 pages • 2024 Popular
  • An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by specia...
    (0)
  • $15.49
  • 1x sold
  • + learn more
PJM Generation Operation Exam Questions &  Correct Answers | Latest Update |Already  Graded A+
  • PJM Generation Operation Exam Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 12 pages • 2024
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? : 5 days If PJM ACE shows overgeneration, actual imports are: : Less than scheduled Who should a generator contact at PJM to clear an outage ticket? : Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: : +/-.02 Hz What frequency would PJM set to correct for fast-time error? : 59.98Hz What frequency would PJM set to correct for slow-time error...
    (0)
  • $9.49
  • + learn more
PjM - Designer Hacks Exam Questions &  Correct Answers | Latest Update |Already  Graded A+
  • PjM - Designer Hacks Exam Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 20 pages • 2024
  • Work plans are used as a tool in project management. Which of the following statements regarding this tool are true? Check the three that apply. A. Creating a work plan is one of the most important tasks that should be done as early as possible B. A work plan is sometimes referred to as a fee proposal C. A work plan is sometimes referred to as a fee projection D. Must be detailed enough to assign tasks to individual staff members E. The first task of a work plan is at the bottom of the ...
    (0)
  • $10.49
  • + learn more
PJM Test Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Test Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 52 pages • 2024
  • Which of the following balancing control modes is used by PJM under normal operations? : Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? : Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability : Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generato...
    (0)
  • $13.49
  • + learn more
PJM Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 47 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? : When expected generation levels fall within 2500 MW of normal op...
    (0)
  • $13.49
  • + learn more
PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+
  • PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 46 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) ...
    (0)
  • $13.29
  • + learn more
PJM Generation Dispatcher Exam Practice Questions & Correct Answers | Latest Update | Already Graded A+
  • PJM Generation Dispatcher Exam Practice Questions & Correct Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 10 pages • 2024
  • An EXCITER on a traditional generator does what? : Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. : Limits When synchronizing to the interconnection, what needs to be synchronized? : Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? : 10A or greater is measured by special equipment at Missouri Ave or Meadowbrook and the measurement is ...
    (0)
  • $9.99
  • + learn more
PJM Generator Exam Questions & Correct  Answers | Latest Update |Already Graded A+
  • PJM Generator Exam Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 11 pages • 2024
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ : immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: : Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ : the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations...
    (0)
  • $10.99
  • + learn more
PJM Generation Dispatch Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A+
  • PJM Generation Dispatch Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 95 pages • 2024
  • Available in package deal
  • Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. : C) Whenever it becomes too much of a bur...
    (0)
  • $15.29
  • + learn more