PJM Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about PJM? On this page you'll find 72 study documents about PJM.

Page 3 out of 72 results

Sort by

PJM Generation Dispatcher Sample Exam |  Questions & 100% Correct Answers (Verified) |  Latest Update | Grade A+
  • PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) : D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error : A. system constraints 2 | P a g e PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( i...
    (0)
  • $10.49
  • + learn more
PJM Generator Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Generator Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ : immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: : Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ : the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations ...
    (0)
  • $9.99
  • + learn more
PJM Generation Dispatcher Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A+
  • PJM Generation Dispatcher Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • An EXCITER on a traditional generator does what? : Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. : Limits When synchronizing to the interconnection, what needs to be synchronized? : Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? : 10A or greater is measured by special equipment at Missouri Ave or Meadowbrook and the measurement is ...
    (0)
  • $9.99
  • + learn more
PJM Generation Operation Exam 2024 |Questions with Complete Solutions
  • PJM Generation Operation Exam 2024 |Questions with Complete Solutions

  • Exam (elaborations) • 8 pages • 2024
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? - 5 days If PJM ACE shows overgeneration, actual imports are: - Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz What frequency would PJM set to correct for fast-time error? - 59.98Hz What frequency would PJM set to correct for slow-time error? - 60...
    (0)
  • $12.49
  • + learn more
PjM - 2024 Exam| with Questions and Complete Solutions
  • PjM - 2024 Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 30 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV
    (0)
  • $12.89
  • + learn more
PJM Transmission Exam Study Questions with Complete Solutions
  • PJM Transmission Exam Study Questions with Complete Solutions

  • Exam (elaborations) • 32 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) - Wh...
    (0)
  • $12.89
  • + learn more
PJM Generator Exam |Questions with Complete Solutions
  • PJM Generator Exam |Questions with Complete Solutions

  • Exam (elaborations) • 7 pages • 2024
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ - immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: - Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ - the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations exist
    (0)
  • $12.49
  • + learn more
PjM - Designer Hacks Exam| with Questions and Complete Solutions
  • PjM - Designer Hacks Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 16 pages • 2024
  • Work plans are used as a tool in project management. Which of the following statements regarding this tool are true? Check the three that apply. A. Creating a work plan is one of the most important tasks that should be done as early as possible B. A work plan is sometimes referred to as a fee proposal C. A work plan is sometimes referred to as a fee projection D. Must be detailed enough to assign tasks to individual staff members E. The first task of a work plan is at the bottom of the sc...
    (0)
  • $12.69
  • + learn more
PJM Test Questions and Answers  Already Passed
  • PJM Test Questions and Answers Already Passed

  • Exam (elaborations) • 54 pages • 2024
  • Available in package deal
  • PJM Test Questions and Answers Already Passed Which of the following balancing control modes is used by PJM under normal operations? Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability Dynamic Instability If PJM experienced an ...
    (0)
  • $11.99
  • + learn more
PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024
  • PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024

  • Exam (elaborations) • 19 pages • 2024
  • PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 WHEN A BA IS UNDERGENERATING, IT MEANS? ANS-TOTAL GENERATION < THE TOTAL LOAD REACTIVE RESERVE CHECK PROVIDES A SNAPSHOT OF RESERVES ON THE SYSTEM. WHAT ARE THE 3 TYPES OF RESERVES? ANS-1. UNIT MVAR RESERVE = TOTAL LAGGING RESERVE OF ALL SYNCED UNITS 2. SVC'S TOTAL LAGGING RESERVE 3. CAPACTIORS OUT OF SVC, REACTORS IN SVC COUNTS EACH IROL'S Tv SHALL BE LESS THAN OR EQUAL TO __________ MINUTE...
    (0)
  • $12.99
  • + learn more