PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) 
: D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error 
: A. system constraints 
2 | P a g e 
PJM calls for which of the following to recover the ACE so that tie line schedules are 
maintained ? 
A. IRC ( i...
-
PJM Generator Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
The purpose of the Deploy All Resources Action is to instruct all generating resources to 
be on line and at full output _________ 
: immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: 
: Ensure all unit voltage regulators are in service 
PJM can issue the Deploy All Resources Action for________ 
: the entire RTO, specific Control Zones or a subset of a Control Zone if 
transmission limitations ...
-
PJM Generation Dispatcher Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
An EXCITER on a traditional generator does what? 
: Voltage regulation (AVR) if you change the excitation current, you change the 
voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. 
: Limits 
When synchronizing to the interconnection, what needs to be synchronized? 
: Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedure is implemented when? 
: 10A or greater is measured by special equipment at Missouri Ave or 
Meadowbrook and the measurement is ...
-
PJM Generation Operation Exam 2024 |Questions with Complete Solutions
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? - 5 days 
If PJM ACE shows overgeneration, actual imports are: - Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator 
To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz 
What frequency would PJM set to correct for fast-time error? - 59.98Hz 
What frequency would PJM set to correct for slow-time error? - 60...
-
PjM - 2024 Exam| with Questions and Complete Solutions
- Exam (elaborations) • 30 pages • 2024
-
- $12.89
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and 
Frequency 
What are the Minimum Source Requirements-(500kV+) for a 500 kV? - 30 MW Gen/mile of 
energized 500 kV and 20 MW Load/mile of energized 500 kV
-
PJM Transmission Exam Study Questions with Complete Solutions
- Exam (elaborations) • 32 pages • 2024
-
- $12.89
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and 
Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 
30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal operating 
limits) - Wh...
-
PJM Generator Exam |Questions with Complete Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $12.49
- + learn more
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on 
line and at full output _________ - immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation 
Operators should: - Ensure all unit voltage regulators are in service 
PJM can issue the Deploy All Resources Action for________ - the entire RTO, specific Control 
Zones or a subset of a Control Zone if transmission limitations exist
-
PjM - Designer Hacks Exam| with Questions and Complete Solutions
- Exam (elaborations) • 16 pages • 2024
-
- $12.69
- + learn more
Work plans are used as a tool in project management. Which of the following 
statements regarding this tool are true? Check the three that apply. 
A. Creating a work plan is one of the most important tasks that should be done as early 
as possible 
B. A work plan is sometimes referred to as a fee proposal 
C. A work plan is sometimes referred to as a fee projection 
D. Must be detailed enough to assign tasks to individual staff members 
E. The first task of a work plan is at the bottom of the sc...
-
PJM Test Questions and Answers Already Passed
- Exam (elaborations) • 54 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
PJM Test Questions and Answers 
 
Already Passed 
 
Which of the following balancing control modes is used by PJM under normal operations? 
Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load 
forecast? Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
 
3. Emergency Max 
4. Dynamic Instability Dynamic Instability 
 
If PJM experienced an ...
-
PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 19 pages • 2024
-
- $12.99
- + learn more
PJM Test Prep | 200 Questions with 100% Correct Answers | Verified | Latest Update 2024 
WHEN A BA IS UNDERGENERATING, IT MEANS? ANS-TOTAL GENERATION < THE TOTAL LOAD 
 
REACTIVE RESERVE CHECK PROVIDES A SNAPSHOT OF RESERVES ON THE SYSTEM. WHAT ARE THE 3 TYPES OF RESERVES? ANS-1. UNIT MVAR RESERVE = TOTAL LAGGING RESERVE OF ALL SYNCED UNITS 
 
2. SVC'S TOTAL LAGGING RESERVE 
 
3. CAPACTIORS OUT OF SVC, REACTORS IN SVC COUNTS 
 
EACH IROL'S Tv SHALL BE LESS THAN OR EQUAL TO __________ MINUTE...