PJM Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about PJM? On this page you'll find 72 study documents about PJM.

Page 2 out of 72 results

Sort by

PJM Test Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • PJM Test Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 56 pages • 2024
  • Available in package deal
  • Which of the following balancing control modes is used by PJM under normal operations? : Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? : Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability : Dynamic Instability 2 | P a g e If PJM experienced an event that caused the loss of a 1,00...
    (0)
  • $13.49
  • + learn more
PJM Transmission Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Transmission Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 49 pages • 2024
  • Available in package deal
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits)...
    (0)
  • $13.49
  • + learn more
PJM Generator Operator Capacity Emergencies Exam | Questions & 100% Correct Answers  (Verified) | Latest Update | Grade A+
  • PJM Generator Operator Capacity Emergencies Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Unit Startup Notification Alert : Place generating units into a state of readiness (able to be brought online with 48 hours); when a reliability assessment determines long lead time generation is needed for a future period; roughly 6 days prior to day needed Maximum Generation/Load Management Alert : Issued 1 or more days prior to operating day in question; to provide early alert that system conditions may require Maximum Generation Emergency (forecasted operating reserve requirement ...
    (0)
  • $10.39
  • + learn more
PJM Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 27 pages • 2024
  • Available in package deal
  • During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO : TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental : Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? : 20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? : 75 MVA Power transformer is connected to the g...
    (0)
  • $12.49
  • + learn more
PJM Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • What is the threshold for having a satellite phone? : 500 MW How often is reactive testing completed? : 5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation : Loss of adjacent control area generation PJM should be made aware of any fuel shortage that a generator may experience. This information assists in ana...
    (0)
  • $12.99
  • + learn more
PJM Practice Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). : off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW : 3 MW PJM calls for which of the following to recover the ACE so that tie line schedules are maintained? A. instantaneous reserve...
    (0)
  • $9.99
  • + learn more
PJM Generation Operation Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A+
  • PJM Generation Operation Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? : 5 days If PJM ACE shows overgeneration, actual imports are: : Less than scheduled Who should a generator contact at PJM to clear an outage ticket? : Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: : +/-.02 Hz What frequency would PJM set to correct for fast-time error? : 59.98Hz 2 | P a g e What frequency would PJM set to correct for sl...
    (0)
  • $9.99
  • + learn more
PJM Sample Test Review Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A
  • PJM Sample Test Review Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating ______________ : off cost out of merit. Monitoring ___________ may give insights into system constraints. : Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. : PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. : light load period 2 | P ...
    (0)
  • $12.39
  • + learn more
PJM Practice Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. : c. 4 hours The following would be considered non-critical plant load (Select 2) : A. Office Area Air Conditioners C. Lighting During a Cold Weather Alert, PJM will take which of the actions : D. Assume an unavailability rate for schedule generation When PJM issues a High System Voltage Message, the GO should have its units operate at: : B. The lower end of their voltage bandwidth What wou...
    (0)
  • $14.29
  • + learn more
PJM Generation Cert Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A+
  • PJM Generation Cert Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • Actions in low voltage alert? : Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? : Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? : Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures have been taken to increase reserves Hot...
    (0)
  • $14.39
  • + learn more