PJM Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about PJM? On this page you'll find 72 study documents about PJM.
Page 2 out of 72 results
Sort by
-
PJM Test Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 56 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Which of the following balancing control modes is used by PJM under normal 
operations? 
: Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? 
: Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units 
EXCEPT: 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability 
: Dynamic Instability 
2 | P a g e 
If PJM experienced an event that caused the loss of a 1,00...
-
PJM Transmission Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 49 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 
kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal 
operating limits)...
-
PJM Generator Operator Capacity Emergencies Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $10.39
- + learn more
Unit Startup Notification Alert 
: Place generating units into a state of readiness (able to be brought online with 
48 hours); when a reliability assessment determines long lead time generation is 
needed for a future period; roughly 6 days prior to day needed 
Maximum Generation/Load Management Alert 
: Issued 1 or more days prior to operating day in question; to provide early alert 
that system conditions may require Maximum Generation Emergency (forecasted 
operating reserve requirement ...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
What is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation 
: Loss of adjacent control area generation 
PJM should be made aware of any fuel shortage that a generator may experience. This 
information assists in ana...
Want to regain your expenses?
-
PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). 
: off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and reactive 
power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW 
: 3 MW 
PJM calls for which of the following to recover the ACE so that tie line schedules are 
maintained? A. instantaneous reserve...
-
PJM Generation Operation Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 
: 5 days 
If PJM ACE shows overgeneration, actual imports are: 
: Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? 
: Master Coordinator 
To correct for a slow or fast clock, system frequency schedules are offset by: 
: +/-.02 Hz 
What frequency would PJM set to correct for fast-time error? 
: 59.98Hz 
2 | P a g e 
What frequency would PJM set to correct for sl...
-
PJM Sample Test Review Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $12.39
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ 
: off cost out of merit. 
Monitoring ___________ may give insights into system constraints. 
: Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedules are 
maintained. 
: PJM calls on synchronized reserves 
If not cancelled by PJM, the minimum generation alert expires at the end of the 
specified ______________. 
: light load period 
2 | P ...
-
PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $14.29
- + learn more
A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual 
implementation. 
: c. 4 hours 
The following would be considered non-critical plant load (Select 2) 
: A. Office Area Air Conditioners 
C. Lighting 
During a Cold Weather Alert, PJM will take which of the actions 
: D. Assume an unavailability rate for schedule generation 
When PJM issues a High System Voltage Message, the GO should have its units 
operate at: 
: B. The lower end of their voltage bandwidth 
What wou...
-
PJM Generation Cert Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 46 pages • 2024
- Available in package deal
-
- $14.39
- + learn more
Actions in low voltage alert? 
: Review transmission & generation outages 
Request reactive reserve check 
Heavy load voltage schedule warning purpose is to have members prepare far max 
support of voltages on the? 
: Bulk Power System 
Manual load dump warning & reduction of Non-critical plant load issued when? 
: Primary reserve is less the the largest generating unit. 
Loss of transmission facility jeopardize reliability after all possible measures have been 
taken to increase reserves 
Hot...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia