CIS 511 Enterprise Resource Planning (CIS 511)

Strayer University

Voici les meilleures ressources pour passer CIS 511 Enterprise Resource Planning (CIS 511). Trouvez guides d'étude pour CIS 511 Enterprise Resource Planning (CIS 511), notes, devoirs et bien plus encore.

All 4 résultats

Trier par

Strayer University_CIS 511 Week 8 Assignment 3, Integrated Case Study: Bandon Group, Inc/CIS 511 Week 8 Assignment 3, Integrated Case Study -ERP |COMPLETED|
  • Strayer University_CIS 511 Week 8 Assignment 3, Integrated Case Study: Bandon Group, Inc/CIS 511 Week 8 Assignment 3, Integrated Case Study -ERP |COMPLETED|

  • Dissertation • 6 pages • 2020
  • Disponible en pack
  • CIS 511 Week 8 Assignment 3, Integrated Case Study: Bandon Group, Inc. Read the integrated case study on Bandon Group, Inc. starting on page 151. Review Table 1 on page 155 explaining the Activities, Documentation, and Things to Do. Complete the following: • Step 8: Determine feasibility of an ERP system • Step 9: Determine ERP design issues
    (0)
  • $8.98
  • + en savoir plus
Strayer University:CIS 511 Assignment 2 Integrated Case Study, Bandon Group, Inc;COMPLETED
  • Strayer University:CIS 511 Assignment 2 Integrated Case Study, Bandon Group, Inc;COMPLETED

  • Dissertation • 7 pages • 2020
  • Disponible en pack
  • CIS 511 Assignment 2 Integrated Case Study, Bandon Group, Inc. Read the integrated case study on Bandon Group, Inc. starting on page 151. Review Table 1 on page 155 explaining the Activities, Documentation, and Things to Do. Complete the following: • Step 6: Document current IT situation – External • Step 7: Determine gap between current IT situation and desired IT direction
    (0)
  • $8.98
  • + en savoir plus
Strayer University_CIS 511 Week 1 Assignment 1: Integrated Case Study: Bandon Group, Inc;COMPLETED
  • Strayer University_CIS 511 Week 1 Assignment 1: Integrated Case Study: Bandon Group, Inc;COMPLETED

  • Dissertation • 11 pages • 2020
  • Disponible en pack
    (0)
  • $10.98
  • + en savoir plus