Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 55 study documents about .
All 55 results
Sort by
-
PJM Generator Exams Pack | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Package deal • 16 items • 2024
-
- $28.49
- + learn more
PJM Generator Exams Pack | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
-
Ultimate PJM Generation Exam Review | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
What is an ISO/RTO responsible for? 
: -Grid operations 
-Reliability 
-Transmission service 
Is an ISO/RTO is independent from: 
: -market participants 
-governance structure 
Does an ISO/RTO posses operational authority? 
: Yes 
PJM as an RTO Functions: 
: - Administer tariff 
- Administer regional wholesale e
-
PJM Bundled Exams Questions and Answers Latest Versions (2024/2025) (Complete and Accurate)
- Package deal • 10 items • 2024
-
- $20.49
- + learn more
PJM Bundled Exams Questions and Answers Latest Versions (2024/2025) (Complete and Accurate)
-
PJM Generation Operation Exam 2024 with Verified Solutions
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM Generation Operation Exam 2024 
 
with Verified Solutions 
 
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 5 days 
 
If PJM ACE shows overgeneration, actual imports are: Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? Master Coordinator 
 
To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz 
 
What frequency would PJM set to correct for fast-time error? 59.98Hz 
 
...
-
PJM Generation Bundled Exams Questions and Answers 100% Verified and Updated | Graded A
- Package deal • 6 items • 2024
-
- $45.49
- + learn more
PJM Generation Bundled Exams Questions and Answers 100% Verified and Updated | Graded A
Want to regain your expenses?
-
PJM Generation Dispatch Exam Questions and Answers
- Exam (elaborations) • 74 pages • 2024
-
- $14.49
- + learn more
PJM Generation Dispatch Exam Questions and Answers 
Which of the following statements is correct concerning PJM assuming frequency 
control of the restoration process? 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too much of a burden for any one Transmission Owner within 
the RTO 
D) Whenever the Transmission Owners within the RTO agree to let PJM control the 
pro...
-
PJM Generation Dispatcher Sample Exam Questions and Answers
- Exam (elaborations) • 12 pages • 2024
-
- $12.49
- + learn more
PJM Generation Dispatcher Sample 
Exam Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error - Correct Answer ️️ -A. system constraints 
PJM calls for which o...
-
PJM Test Questions with 100% Correct Solutions
- Exam (elaborations) • 40 pages • 2024
-
- $13.49
- + learn more
PJM Test Questions with 100% Correct Solutions 
Which of the following balancing control modes is used by PJM under normal 
operations? - Correct Answer ️️ -Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? - Correct Answer ️️ -Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units 
EXCEPT: 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - Corr...
-
PJM Generator Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generator Exam Questions and Answers 
The purpose of the Deploy All Resources Action is to instruct all generating resources 
to be on line and at full output _________ - Correct Answer ️️ -immediately upon 
receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators 
are in service 
PJM can issue the Deploy All Resources Action for________ - Correct Answe...
-
PJM Generation Dispatcher Exam Practice Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generation Dispatcher Exam 
Practice Questions and Answers 
An EXCITER on a traditional generator does what? - Correct Answer ️️ -Voltage 
regulation (AVR) if you change the excitation current, you change the voltage. 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct 
Answer ️️ -Limits 
When synchronizing to the interconnection, what needs to be synchronized? - Correct 
Answer ️️ -Frequency, Voltage, and phase angle. 
GMD (GeoMagnetic Disturbance) procedu...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia