logo-home

Nursing Tec

On this page, you find all documents, package deals, and flashcards offered by seller Braindoc.

Community

  • Followers
  • Following

5 Reviews received

2391 items

BNSF Roadway Worker Protection Exam Questions with Correct Answers

(0)
$14.29
0x  sold

BNSF Roadway Worker Protection Exam Questions with Correct Answers Roadway Worker Protection training - Answer-Must be renewed annually. The cardinal rule of railroading is: - Answer-Always expect a train or equipment to move on any track in either direction at any time. "Fouling" the track means being within feet of the field side of the nearest rail. - Answer-4 According to the FRA, when working in the foul: - Answer-A person or equipment could be struck by a train or on-track eq...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 3 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF RCO Test Questions with All Correct Answers

(0)
$13.89
0x  sold

BNSF RCO Test Questions with All Correct Answers Control and fuel pump switch - Answer-Provides power to the fule pump on the locomotive. This switch should be ON the controlling locomotive. Low lube oil button - Answer-detects a loss of lubricating oil pressure and directs governor to shut down the diesel engine Low water buton - Answer-located on the left front corner of the diesel engine near the GOVERNOR and is issued to detect a loss of cooling water pressure. If the LOW WATER butt...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 4 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF Maintenance of Way Operating Rules Test

(0)
$12.49
0x  sold

BNSF Maintenance of Way Operating Rules Test Track warrant control- method to authorize train movements or protect men and equipment on a main track within specified limits in a territory designated by the timetable. - Answer-TWC When used in relation to a manually operated switch or derail, a lock that can be locked or unlocked only by the craft or group of workers applying the lock. - Answer-Effective locking device A track extending through yards and between stations that must not be o...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 12 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

Bundle For BLEA 2024 Exam Questions with Correct Answers

(0)
$32.49
0x  sold

1 Exam (elaborations) BLEA Firearms Final Exam Questions and Answers All Correct 2 Exam (elaborations) BLEA Criminal Law Final Test with Correct Answers (1) 3 Exam (elaborations) BLEA Crim Law Midterm Test Questions with Correct Answers 4 Exam (elaborations) BLEA Communications Final Test Questions with All Correct Answers 5 Exam (elaborations)

i x
  • Package deal
  •  • 5 items • 
  • by Braindoc • 
  • uploaded  27-05-2024
i x

BNSF Homework 4 Questions with Correct Answers

(0)
$13.29
0x  sold

BNSF Homework 4 Questions with Correct Answers Before initiating movement on a main track, a crew member must: - Answer-Receive track bulletins affecting their movementDetermine from the train dispatcher or yardmaster if any track bulletins are needed Yard limits is a main track authority for maintenance of way - Answer-False What is required before a train can make a reverse movement outside the block in CTC? - Answer-Permission from the control operator At what speed must a reverse m...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 6 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF GCOR FOR FINAL EXAM WITH COMPLETE SOLUTIONS GRADED A+

(0)
$14.09
0x  sold

BNSF GCOR FOR FINAL EXAM WITH COMPLETE SOLUTIONS GRADED A+ What is essential to job safety and continued employment? - Answer-Obeying the rules The right to challenge a directive which based on the employees good faith determination, would violate a railroad operating rule relating to; - Answer-Shoving movements, leaving equipment foul of an adjacent track or the handling of hand- operated swithches or fixed derails. A freight car with any defect that makes it unsafe for movement must be:...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 11 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF GCOR Exam Questions with Correct Answers

(0)
$12.79
0x  sold

BNSF GCOR Exam Questions with Correct Answers What is the timetable direction when moving from MP 27.0 to Coal Jct. on the coal subdivision? - Answer-Westward. What is the length of the siding at Buddwood on the Woods subdivision? - Answer-8442 Feet. H & H Feed is a location not shown as a station on the Woods subdivision, what is the length of the track at H & H Feed? - Answer-763 Feet. What is the milepost location of Cutoff Jct. on the Coal subdivision? - Answer-21.6 In the stati...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 13 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF Dispatcher Training Exam with A Grade Solutions

(0)
$12.79
0x  sold

BNSF Dispatcher Training Exam with A Grade Solutions A fixed signal at the entrance of a block that governs trains entering and using that block. - Answer-Block Signal Timetable Letter "A" - Answer-Automatic Interlocking Timetable Letter "B" - Answer-General Orders, Notices, & Circulars Timetable Letter "C" - Answer-Radio Communication Timetable Letter "g" - Answer-Gate, normal position against conflicting route Timetable Letter "G" - Answer-Gate, normal position agai...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 21 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF Air Brake & Train Handling Test with Complete Solutions

(0)
$13.49
0x  sold

BNSF Air Brake & Train Handling Test with Complete Solutions Draft forces are present when: - Answer-a train is in a slack-stretched condition To qualify a train air brake system using the Air flow Method (AFM, the train must be equipped as follows: - Answer-The controlling locomotive has a maintaining-type automatic brake valve; the train has a gauge or device at the rear of the train; the locomotive has an air flow indicator that shows a direct reading of air flow in increments no greate...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 30 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x

BNSF 2024 Test with Complete Solutions

(0)
$13.79
0x  sold

BNSF 2024 Test with Complete Solutions ABS - Answer-Automatic Block Signal System Absolute Block - Answer-A length of track that no train is permitted to enter while the track is occupied by another train. Absolute Signal - Answer-A block or interlocking signal without a number plate, or designated by an A marker. ATS - Answer-Automatic Train stop system Automatic Block Signal system - Answer-a series of consecutive blocks governed by block signals, cab signals, or both, the signa...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 4 pages • 
  • by Braindoc • 
  • uploaded  27-05-2024
Quick View
i x