logo-home

Nursing school is hard! Im here to simply the information and make it easier!

My mission is to be your LIGHT in the dark. If you"re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and thats all i want for YOU! Stay with me and you will find everything you need to study and pass any tests,quizzes abd exams!

Tutor StudyCenter1 helps you study by writing summaries of study material

StudyCenter1 helps with

Show more

Community

  • Followers
  • Following

12 Reviews received

11 items

NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers

(0)
$13.99
0x  sold

NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers 1. Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.550(g) 2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - CORRECT ANSWER-15ft 3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of? - CORRECT ANSWER-5 to 1 4. According to ASME B30.3, when lifting a suspended personnel platform the design fa...

i x
  • Exam (elaborations)
  •  • 11 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

Tower Crane Practice Test Exam (questions and answers)

(0)
$12.99
0x  sold

Tower Crane Practice Test Exam (questions and answers) Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-b) OSHA 1926.1431 (OJO) According to ASMR B30.3, the prohibited zone for power lines that are 60 kV is: - CORRECT ANSWER-c) 15 ft. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of: - CORRECT ANSWER-d) 5 to 1 According to ASME B30.3, on whose recommendations should a preventative maintenance program ...

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

NCCCO Tower Crane 2024 Latest and Verified

(0)
$11.99
0x  sold

NCCCO Tower Crane 2024 Latest and Verified ASME - CORRECT ANSWER-American Society of Mechanical Engineers ANSI - CORRECT ANSWER-American National Standards Institute ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.30 - CORRECT ANSWER-Ropes OSHA - CORRECT ANSWER-Occupational Safety and Health Administration OSHA 1926.1400cc - CORRECT ANSWER-Cranes in Construction OSHA 1926.1435 - CORRECT ANSWER-Tower Cranes A/D Director - CORRECT ANSWER-Assembly Disassembly director Must - CORRECT ANS...

i x
  • Exam (elaborations)
  •  • 5 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

Which of the following OSHA regulations govern suspended personnel platforms?

(0)
$11.99
0x  sold

Tower Crane Questions and Answers NCCCO Practice Exam Latest Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - CORRECT ANSWER-15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - CORRECT ANSWER-5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardwar...

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

NCCCO tower exam 2024 updated Q&A

(0)
$11.49
0x  sold

NCCCO tower exam 2024 updated Q&A When tower crane is erected/dismantled, written instructions must be - CORRECT ANSWER-On site Tower crane erection/dismantling shall be performed under direct supervision of the - CORRECT ANSWER-Designated person What is the minimum clearance from obstruction when the tower crane freely rotates 360•? - CORRECT ANSWER-6 ft 6 in What must the crane operator do when a load is suspended - CORRECT ANSWERRemain at the controls How often should the hoist r...

i x
  • Exam (elaborations)
  •  • 3 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

NCCCO tower crane Exam Complete Questions and Answers 100% Passed!

(0)
$13.49
0x  sold

NCCCO tower crane Exam Complete Questions and Answers 100% Passed! Splices in rall tracks shall have - CORRECT ANSWER-Smooth Joints Hydraulic systems should have their proper fluid level checked - CORRECT ANSWERDaily If power fails during operations, the following shouldn't apply - CORRECT ANSWER-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be l...

i x
  • Exam (elaborations)
  •  • 11 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions

(0)
$10.49
0x  sold

Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions T or F Very few areas in either the US or Canada require certification to operate a tower crane - CORRECT ANSWER-false T or F Self erecting tower cranes are easier to erect than a conventional tower crane, but erection time takes longer - CORRECT ANSWER-false How does the crane rotate with a fixed tower base? - CORRECT ANSWER-slewing ring beneath the jib T or F A mono type of tower can be either fixed or slewing - ...

i x
  • Exam (elaborations)
  •  • 3 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

NCCCO General Knowledge Practice Exam Q&A 100% A+Graded

(0)
$11.49
0x  sold

NCCCO General Knowledge Practice Exam Q&A 100% A+Graded The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - CORRECT ANSWER-2% The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - CORRECT ANSWER-A. 75% The most unstable working quadrant for a crawler crane is the; - CORRECT ANSWER...

i x
  • Exam (elaborations)
  •  • 5 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

Nccco Study test Exam Questions and Answers Correct Verified

(0)
$11.99
0x  sold

Nccco Study test Exam Questions and Answers Correct Verified continuously - CORRECT ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - CORRECT ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - CORRECT ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - CORRECT ANSWER-according to asme b30.5 ...

i x
  • Exam (elaborations)
  •  • 6 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x

NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A

(0)
$11.49
0x  sold

NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A OSHA 1910 - CORRECT ANSWER-General Industry Standards OSHA 1926 - CORRECT ANSWER-Construction Industry Standards OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - CORRECT ANSWER-Slings OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.5 - CORRECT ANSWER-Mobi...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by StudyCenter1 • 
  • uploaded  18-05-2024
Quick View
i x